Pain Relief Patch for Breast
Pain Relief Patch For Breast,Pain Relief Plaster For Breast,Relief For Breast Pain,Pad Relief Patch For Breast Shandong XiJieYiTong International Trade Co.,Ltd. , https://www.xjplaster.com
[Name] Medical Cold Patch
[Package Dimension] 10 round pieces
The pain relief patch is composed of three layers, namely, backing lining, middle gel and protective film. It is free from pharmacological, immunological or metabolic ingredients.
[Scope of Application] For cold physiotherapy, closed soft tissue only.
[Indications]
The patches give fast acting pain relief for breast hyperplasia, breast fibroids, mastitis, breast agglomera tion, swollen pain.
[How To Use a Patch]
Please follow the Schematic Diagram. One piece, one time.
The curing effect of each piece can last for 6-8 hours.
[Attention]
Do not apply the patch on the problematic skin, such as wounds, eczema, dermatitis,or in the eyes. People allergic to herbs and the pregnant are advised not to use the medication. If swelling or irritation occurs, please stop using and if any of these effects persist or worsen.notify your doctor or pharmacist promptly. Children using the patch must be supervised by adults.
[Storage Conditions]
Store below 30c in a dry place away from heat and direct sunlight.
Concrete Accelerated Maintenance Box Detailed Description and Operating Procedures
1. The concrete accelerated curing box is suitable for cement plants. The building scientific research and construction unit conducts rapid and constant temperature maintenance of all concrete specimens. It can predict 3 days, 7 days and 23 days in 24 hours (users establish prediction orders according to specific conditions) Period) The results of compression and flexural test shorten the cement inspection cycle. This product SY-84 is suitable for the rapid maintenance of test blocks of ordinary Portland cement, slag cement, volcanic ash cement and fly ash cement in cement plants, construction and scientific research units. In line with relevant industry standards, such as T0509-94 "Cement mortar strength accelerated test". Through such maintenance, it is possible to predict the compression and flexural test results of 3 days, 7 days, and 28 days of age (the user can determine the predicted age according to the specific conditions) within 24 hours to shorten the cement testing cycle and speed up the cement factory. and use.
When the temperature inside the box is lower than the given value of the temperature controller, the temperature controller outputs a heating signal to instruct the heating element to start working. Otherwise, when the temperature is higher than the given value, the temperature controller commands the refrigeration system to work. When the temperature reaches the demand, That is, heating or cooling is automatically stopped. Using ultrasonic humidifier to humidify, can ensure the humidity inside the box to achieve the test effect, the temperature controller automatically controls the humidification and dehumidification, when the relative humidity reaches the test effect, the temperature controller commands the humidification and dehumidification work to reach the return difference. After the value, the work stops automatically.
Second, the main technical parameters of concrete accelerated curing box : Temperature control range: room temperature 0-100 °C Time control: 0.5-24 hours Heating power: 1000W/220V Inner box size: 750mm × 550mm × 550mm (2 sets of concrete test can be placed)
Third, the operating procedures:
1. Connect the ground wire as required to ensure safe use. The clean water is injected into the sealing tank to seal the water and seal the water. The water in the tank must exceed the heating pipe. Generally, the water level is 70-90mm.
2. Press the SET button to set the relevant parameters and press the ENTER button to confirm.
3. After the time control reaches the setting requirement, the instrument will automatically power off and the buzzer will sound the experiment.
4, the water level of the water tank should not be too high or too low, too low temperature is easy to burn the tube, generally higher than the upper end of the heating tube 4-5cm is appropriate.
5. After each use, the dirt in the box should be cleaned. If it is not used frequently, the water must be drained and the water traces should be dried. The program controller must be placed in a clean and dry environment.