Aluminum plastic packaging machine installation and precautions

1. Do not install. There is a rubber wheel under the base and it can be moved.

2. Full-time staff training and maintenance.

3. The ground wire should be connected to the specified location of the grounding sign.

4. The machine should be kept clean and tidy.

5. All parts must be refueled before the machine is produced (see the operating provisions).

6. When the machine is shipped from the factory, the gearbox strap is lubricated and must be refueled before production.

7. It is proposed to use the oil-free air compressor.

8. The pressure of forming, heat sealing, indentation, etc. should not be too large, otherwise it will affect the service life. The forming of the indentation type pad should leave a floating space of about one millimeter.

Related products: aluminum-plastic packaging machine, double aluminum packaging machine, small aluminum-plastic packaging machine,

Foam Swabs

Foam Tipped Swab,Black Stick Foam Swab ,Tipped Cleanroom Swabs ,Head Foam Tip Swab

Hunan Kangfutai Medical Devices Co., Ltd. , https://www.3kfut.com